AN INNOVATIVE PMI FOR THE ENERGY TRANSITION

WITH THE PROJECT

SEWAT

(Sustainable Energy by Waves Trap)

or hydroelectric power from the sea

Why?:

The actual high use of energy derived from fossil fuels is necessary to guarantee the current level of quality of life in the developed countries and it allows the growth and evolution of developing countries, but it creates a disequilibrium in the natural balance of the planet.

The use of fossil fuels has countless consequences, such as the accumulation of CO2.
Attention should also be paid to the atmospheric oxygen consumption and the irreversible "creation" of "combustion" water, which increases the planet's water resources and contributes, together with the melting of glaciers, to the rise in sea levels.

IMMAGINE INCREMENTO IDRICO.png

New energy strategies must be sought in order to avoid reaching irreversible and catastrophic effects on environmental disequilibrium.

The survival of the planet requires that future development be totally and truly sustainable. This implies the progressive renunciation of fossil energy by providing energy supply, in a sustainable way, from renewable sources.

The energy possessed by sea waves is a fully and truly sustainable form of energy which, if appropriately captured, could contribute to meeting energy needs.

IN A SHORT TIME IT IS NECESSARY:

REDUCE THE USE OF FOSSIL ENERGY

INCREASING THE USE OF SUSTAINABLE ENERGY

SEA WAVES ARE AN ENERGY RESERVE WHOSE ENERGY IS CONSTANTLY WASTED CAUSING COASTAL EROSION

Immagine LAMPADINA.png
Immagine pensante.png

WITH SEWAT WE WANT TO EXPLOIT IT

SEWAT PRODUCES SUSTAINABLE ENERGY BY REPLICATING THE NATURAL SCENARIO OF CRASHING WAVES IN AN ORDERLY AND HIGHLY PRODUCTIVE WAY

Immagine slide n. 4 .png
Immagine slide n. 5 .png
Immagine slide n. 6.png

SEWAT DEVICE IS A SIMPLE TANK

trapped  water 
tank
calm sea
mobil gates
waves
hydraulic turbines
Immagine prova 3.jpg
prototipo.jpg
foto modello.jpg

prototype under construction

prototype turbine at sea

model for idea validation

Immagine slide n. 8 .png
Immagine slide n. 9 .png
Immagine slide n. 10 .png
Immagine slide n. 11.png

compared to the market and competitors

Immagine go to market.png

respect for the environment

Immagine circolare impatto ambientale con scritta a lato.png
Immagine slide n. 12.png
Immagine disegno vasca accostata diga.png
Immagine disegno vasca in posizione isolata.png
Immagine disegno vasca accostrata barriera frangiflutti.png

SEWAT scheme near the breakwater

SEWAT scheme in isolated position instead of breakwater barriers

SEWAT scheme near the sea wall

Immagine slide n. 13.png
Maintenance only concerns the panels with the mobile gates and the turbogenerators. On-site operations consist of the rapid replacement of the assemblies for workshop maintenance. Maintenance operations do not require production downtime.
 
Immagine slide n. 14.png
Immagine slide n. 15.png
Immagine slide n. 17.png
Immagine the market.png
Immagine crescita ricavi.png

the business is the low-cost sale of sustainable energy and green hydrogen

revenue growth follows scalability and replicability

the unit cost of energy is reduced with modularity and scalability

the sustainable energy business is not afraid of crisis
the green hydrogen market is in its infancy and is growing

Immagine the competitor.png
Immagine business model.png

THE TEAM

Immagine team.png

CEO Gabriella

GUARDIGNI.

All activities related to the design and development of the SEWAT project were carried out by the technical members of GECO s.r.l.

P:I. Amelia MAELLARO

founding member

dr. eng. Cosimo MAELLARO

founding member

Late dr. eng. Vito Mosè  MAELLARO

founding member

dr. eng. Giulio Teodoro MAELLARO

founding member

if necessary supported by external collaboration of technicians

Eng. Felice  FRASCINO

P.I. Antonio FRASCINO

P.I. Angelo Maria MARINI

Mariarosaria MARINI

GECO - Global Engineering Constructions was founded in 2001. Since 2019, it has been registered as an Innovative SME, having focused its activities exclusively on the development of the SEWAT project.
All operations related to the construction of the SEWAT prototype were entrusted to specialized companies in the sector that possessed the requisites required by the particular nature of the works.